Plate load test
Irrigation is important to prevent damage to the original structure in case of excess salt water; Similarly, BNB customer Matrix Pharma is involved in Plate load test irrigation service to deal with water intrusion problems. On December 22, 2018, BNB launched an irrigation project to reduce water levels for basic construction. BNB began drilling on December 23, 2018 and was burned 50 feet. The drill hole is 8 “in diameter. The drill is completed on December 24, 2019 and leads to a well with 5” diameter casing. In addition, BNB introduced piezometers, which required installation of two holes (40 to 500 feet from the production hole) and a small pore depth (40 feet per head) and 4 “, including all work.
These wells are designed to measure the water level before and during the pump through the pump to submerge the water well. After all the good construction work on December 28, the submerged pump (2hp) was installed for water quality and quantity. The 1.5 “guidelines have been installed. Test results have been carried out for approximately 48 hours. Com. 48 hours.
This area is close to the Korangi River, the participation factor is very high and the water level recovery is very high. Maintaining a return is very challenging. BNB has proposed 33 numbers. Drill holes with an effective sink pump, which can hold 70 ‘GMPs at the construction site with a 20’ X factor and maintain pump pump depth at 35 feet. Up to 40 feet.
After implementing BNB’s proposal with a sufficiently low pump set, BNB’s customers were able to lay a safer and better foundation to achieve a dry target depth and continue construction of the plant.